Title says it all, it's not a big spawn nor a difficult job, I just can't do it. PS: I don't need people saying "Wtf you can't use WE noob" I just need some assistance is all.
If you don't care that the server is playable during a paste, you can just set the spigot timeout really high, paste, get some lunch and it will be doneIsn't it just //schematic load filename
and then //paste ?
I loled too much then I should have at this.I'll do it for $100
This post was at the end of January over a month ago... no need to post on itUse the Plugin "SafeEdit" allows you to paste limited blocks at time so it will load the schematic anywhere from 1 block a second to 100000
For example just type //paste 25 and it will paste 25 blocks a second
